Interenergo Logo - Link zur Startseite

Reference Projects

Biomass district heating Lenart

In 2010 we built a biomass district heating system for the town of Lenart. A 3,5 MW biomass boiler was installed as a primary generator of heat and additional 3,5 MW heating-oil boiler was installed to provide back up. We also built a heat distribution network of 5000 m in length and substations for all of the 600 consumers connected to the network. On average we supply 6,7 GWh of heat per year to the end consumers. Wood chips are purchased from the local suppliers to support local economy and minimize the transport related emissions. As a result, Biomass DH Lenart has significantly improved air quality in the area.

In 2010 we built a biomass district heating system for the town of Lenart. A 3,5 MW biomass boiler was installed as a primary generator of heat and additional 3,5 MW heating-oil boiler was installed to provide back up. We also built a heat distribution network of 5000 m in length and substations for all of the 600 consumers connected to the network. On average we supply 6,7 GWh of heat per year to the end consumers. Wood chips are purchased from the local suppliers to support local economy and minimize the transport related emissions. As a result, Biomass DH Lenart has significantly improved air quality in the area.

Heat pump in hotel Dom Planica

In Planica, the famous ski jump center, there is a hotel Dom Planica offering accommodations for sport professionals and tourists. Using our expertise, we designed and installed more economical and environmentally friendlier heat source using air to water heat pumps. The cooperation was set as energy contracting service, where the investment is financed by Interenergo as ESCO partner. Using newly installed system the cost of heating has decreased for nearly 20%. After the expiration of the 10-year contract the ownership will be transferred to Dom Planica and from than onwards the savings will be around 40%.

In Planica, the famous ski jump center, there is a hotel Dom Planica offering accommodations for sport professionals and tourists. Using our expertise, we designed and installed more economical and environmentally friendlier heat source using air to water heat pumps. The cooperation was set as energy contracting service, where the investment is financed by Interenergo as ESCO partner. Using newly installed system the cost of heating has decreased for nearly 20%. After the expiration of the 10-year contract the ownership will be transferred to Dom Planica and from than onwards the savings will be around 40%.

Technical design of heating system in company Elan d.d.

Elan d.d. is a well-established Slovenian producer of skies, yachts and wind turbines. They were facing a challenging renovation of their worn-out heat generation systems. A new solution had to provide optimal heat generation with different inflow temperatures for various parts of facilities. Interenergo was trusted to find the optimal technical solution. We succeeded in designing the solution to fulfil all technical requirements/aspects and at the same time lower the cost of heat for 30%. The payback period of the investment will be 5,5 years. CO2 emissions will by reduced for as much as 767.000 kg of C02 per year.

Elan d.d. is a well-established Slovenian producer of skies, yachts and wind turbines. They were facing a challenging renovation of their worn-out heat generation systems. A new solution had to provide optimal heat generation with different inflow temperatures for various parts of facilities. Interenergo was trusted to find the optimal technical solution. We succeeded in designing the solution to fulfil all technical requirements/aspects and at the same time lower the cost of heat for 30%. The payback period of the investment will be 5,5 years. CO2 emissions will by reduced for as much as 767.000 kg of C02 per year.

Suppling heat for Stop shop center Kranj

Interenergo is providing energy supply service for Stop shop center in Kranj. We have invested in new heating system consisting of two 550 kW gas boilers. The duration of the contract is 10 years, during this time we are operating and maintaining the boilers to ensure uninterrupted supply of heat (990 MWh/year).

Interenergo is providing energy supply service for Stop shop center in Kranj. We have invested in new heating system consisting of two 550 kW gas boilers. The duration of the contract is 10 years, during this time we are operating and maintaining the boilers to ensure uninterrupted supply of heat (990 MWh/year).

Suppling heat for Stop shop center Novo mesto

Interenergo is providing energy supply service for Stop shop center in Novo mesto. We have invested in new heating system consisting of a 380 kW gas boiler. The duration of the contract is 10 years, during this time we are operating and maintaining the boiler to ensure uninterrupted supply of heat (400 MWh/year).

Interenergo is providing energy supply service for Stop shop center in Novo mesto. We have invested in new heating system consisting of a 380 kW gas boiler. The duration of the contract is 10 years, during this time we are operating and maintaining the boiler to ensure uninterrupted supply of heat (400 MWh/year).